the Project study
This project included the renovation of the existing office space, including HVAC and lighting upgrades. The work was completed in two phases. Phase 1 included the renovation of the east portion of the work, while Phase 2 included occupant’s relocation to the Phase 1 area so that remaining work could be completed. The facility remained occupied throughout construction, and work took place without interruption to the Owner’s operations.