the Project stats
300 Spaces
Concrete Subcontractor
Bancroft Architects + Engineers
WORK / MOVE
- Pre-cast deck
the Project study
This project included the construction of a parking structure that will add approximately 300 spaces to the Ann Arbor Veterans Administration campus. A pre-cast deck was added to the existing four-level parking structure, while a horizontal addition was made to provide a second means of traverse between levels that included parking spaces on each level.
The 12-month project required weekend and off-peak hours of work to accommodate traffic in the existing structure. Spence Brothers’ scope of work included the placement of fiber-reinforced concrete slabs, walls, and footings, as well as all traffic control and coordination.