the Project stats
12,400 sf
Construction Manager
SSOE
WORK / HEAL
the Project study
With a long-standing history of trust spanning over six decades, Covenant HealthCare has entrusted Spence Brothers to manage the construction of their latest state-of-the-art, Hybrid OR.
This will be a surgical theatre that is equipped with the most advanced medical imaging devices such as fixed C-Arms (a flouroscopic X-ray system), a CT scanner, and/or MRI scanner. Hybrid ORs equipped with such imaging devices to enable minimally-invasive surgery, which is less traumatic for patients.
The operating rooms require their own HVAC system, which is housed on the first floor of the addition, separate from the main hospital. Six offices are on the first floor for doctors as part of the addition.